In-Situ Density
Many civil
engineering projects require the use of in-situ 'fill' material. Whenever
soil is placed as an engineering fill it is usually compacted to a
dense state to obtain satisfactory engineering properties. Compaction
on site is usually effected by mechanical means such as rolling, ramming
or vibrating. Control of compaction is necessary to achieve a satisfactory
result at a reasonable cost.
Laboratory compaction tests provide the basis for control procedures used on site.
- Proctor Penetrometer
- Sand Replacement
- Sand Cone
- Balloon Density Apparatus
- Core-Cutter Apparatus